2016 – Prince Edward Viaduct – Structural Rehabilitation on Bloor Street over Don Valley Parkway and Bayview Avenue
City of Toronto
Grascan completed removal of deteriorated concrete and repair of the exterior faces of sidewalls, wingwalls, piers and arches on the Prince Edward Viaduct. Work occurred over the Don Valley Parkway (DVP), the Metrolinx rail corridor, a pedestrian pathway and the Don River with various hoarding and protection measures.